Instrumentation of a 250tn KONECRANES' crane in Newcastle

Instrumentation of a 250tn KONECRANES' crane in Newcastle

The 250tn crane in Newcastle upon Tyne has been designed and erected in 1936. The structure is currently (summer 2012) under retrospective. The structural monitoring report is considered to contribute in the structural assessment of the vast structure.

The crane consists of a double cantilever, with the rear shorter part carrying the ballast. The boom consists of a twin frame approximately 60m long.

KONECRANES' 250tn crane in Newcastle
KONECRANES' 250tn crane in Newcastle
heavy duty protective cable conduit and CRD-patch sensor steel cover
heavy duty protective cable conduit and CRD-patch sensor steel cover

The aim of the structural monitoring is to detect the strains at critical positions and compare them to the theoretical values, as deduced from a linear elastic structural model.

FBG sensors real time readings on-site
FBG sensors real time readings on-site
stress - time diagram of No 2 & No 2' sensors
stress - time diagram of No 2 & No 2' sensors

The CRD Group also developed a monitoring software, to cover the needs of both real time monitoring and data post-processing.

real-time crane monitoring software screenshot
real-time crane monitoring software screenshot
remotely controlled crane monitoring software running on in-site pc
remotely controlled crane monitoring software running on in-site pc

CRD-patch FBG sensors' installation photos are provided below:

CRD-patch FBG sensor installed on the top of the cross section
CRD-patch FBG sensor installed on the top of the cross section
abseiler installing a CRD-patch FBG sensor on the bottom of the cross section
abseiler installing a CRD-patch FBG sensor on the bottom of the cross section